Evening all,

In light of the recent issues with mooring arrangements I thought I’d get some opinions on the best way to tie up to the piles.

Currently I have a chain loop (secured with a shackle) through a metal eye and around the ‘floating’ ring onto polyprop buoyant rope. This arrangement is doubled up both ends. The chain is possibly a bit light currently so I shall be changing that. All shackles are moused.

Does that sound sufficient? If anyone has any opinions any pointers/pictures would be great.

Thanks,

Dudley